Dairtnunk Avenue – Twentieth Street to Twenty-Second Street, Cardross
Road Resealing Works
Traffic Control in place
Completion Date 04 December 2026
Calder Highway and Belar Avenue Extension, Irymple
Intersection Upgrade
Works are expected to begin in mid this month (November 2026) and are expected to take approximately four weeks to complete, weather permitting.
Fourteenth Street & Koorlong Avenue, Irymple
Drainage Works Upgrade
Traffic control in place
Completion Date 20 November 2026
Sturt Highway (Deakin Avenue) and Sixteenth Street, Mildura
Intersection Upgrade
The first closure will be between Deakin Avenue and San Mateo Avenue starting from early November 2026. Vehicles will detour via San Mateo Avenue and Fifteenth Street.
The second closure will be between Deakin Avenue and Walnut Avenue. Vehicles will detour via Walnut Avenue and Fifteenth Street.
Works at the intersection include;
- traffic signals and dedicated turning lanes
- signalised pedestrian crossing points on all legs of the intersection (as part of traffic signals) and pedestrian refuges on the Sturt Highway (Deakin Avenue)
- shared user paths for improved connectivity
- upgraded lighting.
Works to continue through to mid-2027.
Rudds Road, Nangiloc
Road Safety Works
Temporary Closure
Closed to traffic 26 October to 26 November
Completion Date 30 November 2026
Eleventh Street – near Belar Avenue in Kings Billabong, Nichols Point
Pram Ramp and Footpath Works
Traffic control in place.
Completion Date 18 December 2026
Irymple Avenue, Karadoc Avenue & First Street, Nichols Point
Nichols Point Drainage Upgrade – Stages 2 & 3
Traffic control in place
Project type Drainage Upgrade – Stages 2 & 3
Completion Date 18 December 2026
Cocklin Avenue and Barnett Road, Red Cliffs
Motorcycle Safety Program
Traffic control in place.
Completion Date 18 December 2026
Morkalla North Road – Sturt Highway to Millewa Road, Werrimull
Gravel Resheeting Works
Traffic Control in place
Completion Date 13 November 2026
Morkalla North Road – Sturt Highway to Millewa Road, Werrimull
Road Shoulder Works
Project schedule 9 November 2026
Completion Date 04 December 2026